Customization: | Available |
---|---|
After-sales Service: | 1 Year/2000 Working Hours |
Warranty: | 1 Year/2000 Working Hours |
Still deciding? Get samples of US$ 9999999/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Specification
|
|
TCE210EV
|
Total Weight
|
T
|
21.5
|
Bucket capacity
|
M³
|
0.9-1.2
|
Motor Model
|
|
YE3-250M-4
|
Rated power
|
Kw/r/min
|
55/1480
|
Rated Voltage
|
V
|
380
|
Rated stored energy
|
KWh
|
/
|
Max displacement
|
L/min
|
210*2
|
Working pressure
|
Mpa
|
34.3
|
Hydraulic pump mode
|
|
APVO125
|
Hydraulic tank volume
|
L
|
230
|
Walking speed (high/low)
|
km/h
|
4.5/2.5
|
Swing speed
|
r/min
|
8.7
|
Climbing ability
|
°
|
35
|
Bucket excavation force
|
KN
|
147.9
|
Arm digging force
|
KN
|
107.3
|
Ground specific voltage
|
KPa
|
50.8
|
Traction force
|
KN
|
223
|
Maximum excavation length
|
mm
|
9270
|
Maximum unloading heigh
|
mm
|
6600
|
Maximum excavation depth
|
mm
|
6525
|
Maximum verticalarm mining depth
|
mm
|
5670
|
The distance when digging 2.5 horizontal plane
|
mm
|
6327
|
Maximum excavation distance
|
mm
|
9820
|
You can send an email or message to explain your needs, and we will recommend a suitable machine for you according to the model and configuration requirements provided.
SPARE PARTS